Primary Frequency Control using Battery Energy Storage Systems

I&T Solution Primary Frequency Control using Battery Energy Storage Systems
(REF : S-0027)
Trial Project
Solution Feature
  • Increasing availability of Battery Energy Storage Systems, partly due to the popularity of electric vehicles
  • Help maintain utility frequency to its nominal value. i.e. 50 or 60 Hz
  • Cost effective compared with other fast responding reserves
  • fast response rate: full response completed in a few milli-seconds
  • The optimal control strategy can be calculated offline with extremely low complexity
Info on I&T Solution Provider
Solution Provider:The Chinese University of Hong Kong
Address:Ho Sin-Hang Engineering Building, Department of Information Engineering, The Chinese University of Hong Kong, Shatin, N.T., HK
Contact Person:Dr Angela Yingjun Zhang
Position:Professor
Tel: 3943 8465
Fax: 2603 5032
Email: yjzhang@ie.cuhk.edu.hk
Webpage: https://staff.ie.cuhk.edu.hk/~yjzhang/

For details of the above I&T solution, please contact the I&T solution provider.