I&T Wish | Fire Damper Inspection
(REF : W-0005) |
|||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Matched I&T Solution | ||||||||||||||||
Trial Project | ||||||||||||||||
Summary and Challenges |
The objective of the project is to provide a robot for
|
|||||||||||||||
Expected Outcome | A robot carries out inspection in air duct and testing of fire damper. The purpose is to apply more advance technology for location with difficult access. | |||||||||||||||
Expected Trial Duration | 18 months (Including 12-month sample/prototype production, 3-months trial and 3-month evaluation and adjustments) | |||||||||||||||
Contact Information |
|
|||||||||||||||
Upload Date | 2018-03-01 | |||||||||||||||
Closing Date | 2018-03-15 | |||||||||||||||
Propose I&T Solution | Closed |