Fire Damper Inspection

I&T Wish Fire Damper Inspection
(REF : W-0005)
Matched I&T Solution
Trial Project
Summary and Challenges

The objective of the project is to provide a robot for

  1. Inspecting the fire damper located where safe access to these fire dampers was not available and the use of mobile access platform was not feasible
  2. Photo recording the status of the fire damper
Expected Outcome A robot carries out inspection in air duct and testing of fire damper.  The purpose is to apply more advance technology for location with difficult access.
Expected Trial Duration 18 months (Including 12-month sample/prototype production, 3-months trial and 3-month evaluation and adjustments)
Contact Information
I&T Wish Proposer:Electrical and Mechanical Services Department (EMSD)
Contact Person:Mr LAM Sau Sing
Position:Engineer/Municipal/Kowloon3
Tel: 31554071
Email: sslam@emsd.gov.hk
Project Deliverables
  1. To enhance the safety of workers by reducing work-at-height
  2. To avoid the use of mobile access platform and scaffolding so as to reduce the cost of inspection
Upload Date 2018-03-01
Closing Date 2018-03-15