An ISO 19650-based Next Generation Common Data Environment (CDE) Platform for Through-life Project Delivery, Asset Operation and Services Optimisation

I&T Wish An ISO 19650-based Next Generation Common Data Environment (CDE) Platform for Through-life Project Delivery, Asset Operation and Services Optimisation
(REF : W-0190)
Matched I&T Solution
Trial Project
Summary and Challenges EMSD is looking for a platform that consists of the following fully integrated modules providing a single source of truth through-life for project, programme and asset level information.
Expected Outcome
  • To develop the next-generation on-premise CDE platform with fully integrated modules for project, programme, and asset level information.
  • To develop a novel method together with relevant algorithms to interpret section drawings and detailed drawings.
  • To develop a method to integrate multiple views recognition and form a comprehensive 3D geometric modeling.
  • To interpret the engineering tables complying to Hong Kong standards and enrich semantic information of generated BIM models.
Expected Trial Duration 18 months (Including 2-month technology study, 10-month system development & production, 2-month installation and calibrations, 3-month trial and 1-month evaluation and adjustments)
Contact Information
I&T Wish Proposer:Electrical and Mechanical Services Department (EMSD)
Contact Person:Mr YUEN Piu Hung, Francis
Position:Electronics Engineer/Building Information Modelling/4
Tel: 28083609
Email: phyuen@emsd.gov.hk
Upload Date 2019-07-08
Closing Date 2019-07-22