Remote Monitoring of Site after Hot Work for Mitigation of Fire Risk

I&T Wish Remote Monitoring of Site after Hot Work for Mitigation of Fire Risk
(REF : W-0461)
Matched I&T Solution
Trial Project
Summary and Challenges Generally, hot work including welding, cutting, brazing, soldering processes is inevitable in E&M works. However, the hot work may arise potential fire risk at an unexpected moment if there is any unnoticed ignition source left behind at an indiscernible location. As a result, a periodic patrol to the site area will be arranged to ensure the site safety after hot work, which is undesirable.
Expected Outcome With use of system for monitoring the condition of unattended site (no matter outdoor / indoor), staff can aware of potential fire hazards before the fire outbreaks.
Expected Trial Duration 12-month
Contact Information
I&T Wish Proposer:Electrical and Mechanical Services Department (EMSD)
Contact Person:Mr. Matthew CHAN
Position:Engineer/Health Sector/New Territories East/2
Tel: 3155 4025
Email: mfchan@emsd.gov.hk
Upload Date 2023-06-09
Closing Date 2023-07-07