I&T Solution |
Semantic AI on Predictive Maintenance of Permanent Way of Railway System
(REF : S-1041)
|
Matched I&T Wish |
|
Trial Project |
|
Solution Feature |
- AI model is developed to identify relationships within the PWay data and provide predictive results;
- A clustered database including columnized database and graph-based database;
- A knowledge graph and user interface to display the analytic results
- Integrated database clusters in the PWay data to perform data analytic and predictive functions.
- We shall perform data analysis of the PWay data provided by EMSD, to generate insights for predictive maintenance;
|
Trial Application and Expected Outcome |
- AI model is developed to identify relationships within the PWay data and provide predictive results;
- A clustered database including columnized database and graph-based database;
- A knowledge graph and user interface to display the analytic results
- Integrated database clusters in the PWay data to perform data analytic and predictive functions.
- We shall perform data analysis of the PWay data provided by EMSD, to generate insights for predictive maintenance;
|
Additional Solution Information |
Proposal_AI_SemanticAI_Railway_s.pdf
|
Info on I&T Solution Provider |
Solution Provider | : | RISKSIS TECHNOLOGY LIMITED |
Address | : | Room 701, Building 10W, Hong Kong Science Park |
Contact Person | : | Alan Lee |
Position | : | Director
|
Tel | : |
60516859
|
Email | : |
alan.lee@risksis.com
|
Webpage | : |
www.risksis.com
|
|