I&T Solution |
Using Global Navigation Satellite System (GNSS) Technology to Monitor Settlement at the District Cooling System Pipes in Kai Tak District
(REF: S-1456) |
Trial Project |
|
Solution Feature |
- Chip level GNSS solution,lower power consumption, higher accuracy;
- Multiple data solving methods,Supportting local computing and cloud deployment;
- Multiple communication methods, suitable for different application scenarios;
- Project reality presentation, Data and information visualization management;
- Cloud edge collaboration, real-time monitoring of pipeline conditions;
|
Trial Application and Expected Outcome |
- The project can use micrometers and micro screw adjustment equipment to undergo slight settlement changes in the experimental environment, and test the sensitivity and measurement accuracy of the equipment;
- The project can construct 2-4 monitoring station pilot sites and 1 benchmark station pilot site for 2-4 weeks of trial operation testing. By comparing with manual monitoring, the effectiveness of the pilot testing stations can be tested;
- The project can achieve long-term stable monitoring with low maintenance frequency, reducing the large amount of resource consumption required by traditional manual monitoring methods.
- The project can achieve 7 * 24 hour settlement monitoring of the cooling pipeline in the Qide area, and provide a rapid alarm mechanism for management personnel;
- The project can provide a trial experience for the platform for 1-2 weeks, understand the various functions of the platform, and confirm the matching of platform services with business needs;
|
Additional Solution Information |
利用全球导航卫星系统(GNSS)技术监测启德区区域供冷系统管道沉降情况.pdf
|
Info on I&T Solution Provider |
Solution Provider | : | Shanghai Medo Monitoring Technology Co.,Ltd | Address | : | Floor 5, Building 1, No. 498, Guo Shoujing Road, Pudong New Area, Shanghai | Contact Person | : | ZhangChuntao |
Position | : | Marketing Director | Tel | : | 17366209164 | Email | : |
chuntao.zhang@shmedo.cn |
|