| I&T Solution |
Grit Disintegration Installation for Sump Pits of Vehicle Axle Weighbridge
(REF: S-1903) |
| Trial Project |
|
| Solution Feature |
- Installed at the drain opening of the sump pit, equipped with a robust supporting framework to ensure stability and optimal performance
- Efficiently disintegrates accumulated sludge, sediments, and grits using an electrically powered mechanism
|
| Trial Application and Expected Outcome |
- Exploratory in nature (PoC), aimed at a pre-defined standardised site
- To design, develop, construct, install, test, and commission a "grit disintegrator" that will be positioned at the drain opening within the sump pit.
- This solution aims to break down the accumulated sludge, sediments, and grits, preventing drain clogs and subsequent flooding
|
| Info on I&T Solution Provider |
| Solution Provider | : | The Cave Technology Limited | | Address | : | Flat 4-A, 13/F, Block A, Tak Lee Industrial Centre, 8 Tsing Yeung Circle, Tuen Mun | | Contact Person | : | Law Wing Ting, Cadence |
| Position | : | Founder | | Tel | : | +852 64899966 | | Email | : |
thecave_tech@outlook.com |
|