Risk Prioritization Analysis on Fixed Electrical Installations

I&T Solution Risk Prioritization Analysis on Fixed Electrical Installations
(REF: S-1928)
Trial Project
Solution Feature
  • Risk Prioritization Analysis on Fixed Electrical Installations
  • Trained OCR engine that can extract input data from WR2 submission Form;
  • Trained OCR engine that can extract input data from WR2 submission Form;
  • Trained OCR engine that can extract input data from WR2 submission Form;
  • The system can prioritize electrical installations risk level
Trial Application and Expected Outcome
  • High-Risk FEI Identification: AI ranks installations by failure probability, allowing inspectors to focus resources on the most dangerous sites first.
  • Predictive Failure Alerts: Generates early warnings for components likely to fail based on historical trends and real-time data.
  • Predictive Failure Alerts: Generates early warnings for components likely to fail based on historical trends and real-time data.
  • Cost & Safety Impact Reduction: Prevents expensive disasters (fires, equipment damage) by proactively mitigating risks.
  • Long-Term Risk Trend Analysis: Tracks deterioration patterns (e.g., increasing insulation faults) to forecast future risks and budget for upgrades.
Additional Solution Information 裝置風險分析.pdf
Info on I&T Solution Provider
Solution Provider:FireAlert Limited
Address:rm 5, units 100-113, Building 5W,
Contact Person:David Ng
Position:CTO
Tel:93148325
Email: david.ng.hk@gmail.com
Webpage: https://firealert.com.hk/

For details of the above I&T solution, please contact the I&T solution provider.