| I&T Solution |
Risk Prioritization Analysis on Fixed Electrical Installations
(REF: S-1928) |
| Trial Project |
|
| Solution Feature |
- Risk Prioritization Analysis on Fixed Electrical Installations
- Trained OCR engine that can extract input data from WR2 submission Form;
- Trained OCR engine that can extract input data from WR2 submission Form;
- Trained OCR engine that can extract input data from WR2 submission Form;
- The system can prioritize electrical installations risk level
|
| Trial Application and Expected Outcome |
- High-Risk FEI Identification: AI ranks installations by failure probability, allowing inspectors to focus resources on the most dangerous sites first.
- Predictive Failure Alerts: Generates early warnings for components likely to fail based on historical trends and real-time data.
- Predictive Failure Alerts: Generates early warnings for components likely to fail based on historical trends and real-time data.
- Cost & Safety Impact Reduction: Prevents expensive disasters (fires, equipment damage) by proactively mitigating risks.
- Long-Term Risk Trend Analysis: Tracks deterioration patterns (e.g., increasing insulation faults) to forecast future risks and budget for upgrades.
|
| Additional Solution Information |
裝置風險分析.pdf
|
| Info on I&T Solution Provider |
|