Optimization Control of Building Cooling System

I&T Wish Optimization Control of Building Cooling System
(REF: W-0070)
Matched I&T Solution
Trial Project
Summary and Challenges Accurate and reliable chiller plant load measurement is essential for chiller sequencing control, performance monitoring and optimization. Traditional approach is simply by measuring the differential temperature of the chilled water supply and return and the total water flow rate to obtain the cooling demand. However many studies and site observations have indicated that errors in actual cooling demand estimation may be as high as 30 % by such measurement. In practical chiller system, temperature sensors may not be able to represent water temperature accurately due to high water pressure, which results in high potential of temperature measurement noise, outlier, systematic error and uncertainty. The errors in cooling load estimation would be amplified when the cooling load is estimated by the differential temperature. 

This study aims to develop an efficient way of optimizing the central A/C system operation for office buildings in Hong Kong.


Expected Outcome

To develop an efficient way of optimizing the central A/C system operation for office buildings in Hong Kong.  

Expected Trial Duration 12 months
Contact Information
I&T Wish Proposer:Electrical and Mechanical Services Department (EMSD)
Contact Person:Mr Lee Ming Bun
Position:Electrical and Mechanical Engineer/Electrical and Mechanical and Building Services Technology Development/1
Tel:37576257
Email: mblee@emsd.gov.hk
Project Deliverables To develop a new total cooling demand estimation, the electricity consumption of the central A/C system would be reduced by 5%. 
Upload Date 2019-06-09
Closing Date 2019-06-23