I&T Wish | Automatic Detection of Rail Crack to Ensure Passenger Safety
(REF : W-0016) |
|||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Matched I&T Solution | ||||||||||||||||
Trial Project | ||||||||||||||||
Summary and Challenges |
The objective of the project is to detect rail crack at early stage with train mounted devices operating in traffic hours to ensure safe operation of railway. |
|||||||||||||||
Expected Outcome | The solution shall detect the crack at early stage with high sensitivity and accuracy. The solution provider shall estimate the sensitivity and accuracy (preferably to be less than 1% error) of the system in the submission. | |||||||||||||||
Expected Trial Duration | 6 months (3 months for system design and installation, 3 months on-site learning and testing) | |||||||||||||||
Contact Information |
|
|||||||||||||||
Upload Date | 2018-03-09 | |||||||||||||||
Closing Date | 2022-03-11 | |||||||||||||||
Propose I&T Solution | Closed |