Summary and Challenges It is necessary to conduct sewage bypass when maintenance of drop shafts of the Harbour Area Treatment Scheme (HATS) is carried out.
Expected Outcome To adopt new methodology or technology for maintenance of the drop shafts of HATS so as to eliminate/reduce the need for sewage bypass.
Expected Trial Duration Trial for 18 months after installation