| Summary and Challenges |
To optimize control philosophy of pumps with Big Data analysis. |
| Expected Outcome |
The objective is to optimise the energy consumption of pumping system through adjusment of pump cut in and cut out levels, pump sequencing, etc.
|
| Expected Trial Duration |
Trial for 12 months after installation
|