I&T Wish - Development of Variable Speed Control System in Filtration Plant 2020-10-5
Development of Variable Speed Control System in Filtration Plant
I&T Wish
Development of Variable Speed Control System in Filtration Plant (REF: W-0327)
Matched I&T Solution
Trial Project
Summary and Challenges
This project aims to develop and install a smart filtration plant control system with turnover rate management for public swimming pool. The prototype shall be able to adjust the turnover rate in advance of the filtration pump based on water quality (including turbidity, pH, temperature, oxidation-reduction potential, water conductivity, salt level and etc) and occupancy of the swimming pool.
Expected Outcome
To develop a variable speed control filtration system with turnover rate management, so as to reduce energy consumption for filtration plant of the swimming pool.
Expected Trial Duration
18 months
Contact Information
I&T Wish Proposer
:
Electrical and Mechanical Services Department (EMSD)
Contact Person
:
Mr WONG Cheuk San
Position
:
Project Officer/Electrical and Mechanical and Building Services Technology Development/2