Adoption of the Solar Glass (fully transparent, with varied transmittance allowable) with a view to harvest energy from light.
The trial shall include a study (i.e. measurement and verification) to investigate the benefit in the energy aspect by deploying the Solar Glass. The service provider shall carry out all associated design and construction works for the completion of this study.
The trial shall include a laboratory test by an accredited laboratory on the Solar Glass (e.g. Optical characteristics testing, etc.)
The trial shall include a prototype testing in a controlled environment.
Expected Outcome
Measurement and verification on the potential benefits that bring along by installing Solar Glass.
Expected Trial Duration
12-month
Contact Information
I&T Wish Proposer
:
Electrical and Mechanical Services Department (EMSD)
Contact Person
:
Wong Cheuk San
Position
:
Project Officer/ E&M and BS Technology Development/ 2