AI-based Control Optimization of Air-Conditioning System at Macau Ferry Terminal

I&T Wish AI-based Control Optimization of Air-Conditioning System at Macau Ferry Terminal
(REF: W-0499)
Matched I&T Solution
Trial Project
Summary and Challenges
  • The overall idea of this project is to deploy artificial intelligence (AI) to optimize the control of air handling unit (AHU) of air-conditioning (AC) system in Macau Ferry Terminal (MFT) to achieve energy saving. IoT sensor data, weather data, passenger flow information and ferry schedule would be used for model training with the aim to reduce energy consumption and provide a more comfortable experience of journey for the passengers. The developed AI model shall maximize the cooling efficiency based on the latest situation and actual demand.
Expected Outcome
  • To enhance the air handling unit (AHU) with control digitization
  • To install IoT sensors for environmental data collection
  • To develop AI model for optimizing and automating the control of air handling unit in order to achieve energy saving
Expected Trial Duration 9-month
Contact Information
I&T Wish Proposer:Electrical and Mechanical Services Department (EMSD)
Contact Person:TANG Siu-wang, Jacky
Position:Electronics Inspector/Municipal/Macau Ferry Terminal
Tel:2736 7648
Email: swtang@emsd.gov.hk
Upload Date 2023-08-25
Closing Date 2023-09-08