| Trial Project |
Two-phase Immersion Cooling System for Control Tower Simulator Workstations
(REF: P-0305) |
| Matched I&T Wish |
|
| Matched I&T Solution |
|
| Solution Feature |
- Customized chemical structure, coolant is compatible to different computer components
- A standalone operating system to dissipate the heat from the workstation to the environment, no additional high performing air-conditioning system is required
- Patent is under application, the chemical structure showed high thermal physical performances
- Coolant with high dielectric performance, non-toxic, no flash point and non-flammable properties
- Monitoring system can be integrated to monitor the performance, thermal dissipation and power consumption
|
| Trial Information |
| Trial Site |
: |
Civil Aviation Department Headquarters |
| Trial Scale |
: |
1 no. of Control Tower Simulator Workstation |
| Trial Duration |
: |
Apr 2024 to Jan 2025 |
|
| Additional Solution Information |
Supporting doc..pdf
|
| Info on I&T Solution Provider |
| Solution Provider | : | Hong Kong Applied Science and Technology Research Institute Company Limited | | Address | : | 5/F, Photonic Centre, Hong Kong Science Park, Shatin, N.T., HK | | Contact Person | : | Mr Jack FOK |
| Position | : | Senior Manager | | Tel | : | 3406 2593 | | Email | : |
Jackfok@astri.org | | Webpage | : | https://www.astri.org/ |
|