| Trial Project |
Implementation of Artificial Intelligence for District Cooling System (DCS) at Hong Kong-Zhuhai-Macao Bridge Hong Kong Port
(REF: P-0301) |
| Matched I&T Wish |
|
| Matched I&T Solution |
|
| Solution Feature |
- Future cooling load prediction by big data analytics
- AI chiller plant optimization control
- Real-time sensor health status verifiation
- Fault Detection and Diagnostics
- Expected more than 10% saving of annual energy consumption
|
| Trial Information |
| Trial Site |
: |
Hong Kong-Zhuhai-Macao Bridge Hong Kong Port |
| Trial Scale |
: |
Whole DCS Chiller System |
| Trial Duration |
: |
Aug 2023 to Aug 2025 |
|
| Additional Solution Information |
ENB AI Chiller 2022.pdf
|
| Info on I&T Solution Provider |
| Solution Provider | : | EnerRight Intelligent Limited | | Address | : | Unit No. 2, 9/F, Kwai Cheong Centre, No. 50 Kwai Cheong Road, Kwai Chung, HK | | Contact Person | : | Rocky Lau |
| Position | : | Head of Building Solutions | | Tel | : | 37073950 / 92184608 | | Email | : |
rocky.lau@enerright.com | | Webpage | : | https://www.enerright.com |
|