Bladeless Wind Turbine Development

创科方案 Bladeless Wind Turbine Development
(编号: S-1891)
试验项目
方案特点
  • Functional scaled prototype of a bladeless wind turbine with modular construction for parameter optimization.
  • Data acquisition system for wind speed, power output, and vibration measurements.
  • Comprehensive experimental data across a wide operating range for verification and optimization.
  • Mathematical framework for extrapolating wind-tunnel test results to full scale.
试验应用及预期成果
  • Phase 1 (Months 1-4) will focus on design and fabrication, including detailed calculations, CAD modeling, and prototype construction.
  • Phase 2 (Months 4-6) will involve wind tunnel setup and calibration, including test section modification and comprehensive instrumentation calibration.
  • Phase 3 (Months 6-10) will cover the main testing program, with systematic wind speed variation tests and detailed performance measurements.
  • Phase 4 (Months 10-12) will be dedicated to analysis and reporting, including data interpretation and development of recommendations for full-scale deployment.
附加方案资料 Bladeless Wind Turbine Development.pdf
方案提供者资料
方案提供者:Department of Mechanical and Aerospace Engineering, HKUST
地址:HKUST, Clear Water Bay
联络人:李建邦
职位:Associate Head and Associate Professor
电话:3469 2232
电子邮件: larryli@ust.hk
网页: https://mae.hkust.edu.hk/en/people/faculty/detail/li-larry

有关上述创新科技解决方案的详情,请联络方案提供者查询。