Bladeless Wind Turbine Development

創科方案 Bladeless Wind Turbine Development
(編號: S-1891)
試驗項目
方案特點
  • Functional scaled prototype of a bladeless wind turbine with modular construction for parameter optimization.
  • Data acquisition system for wind speed, power output, and vibration measurements.
  • Comprehensive experimental data across a wide operating range for verification and optimization.
  • Mathematical framework for extrapolating wind-tunnel test results to full scale.
試驗應用及預期成果
  • Phase 1 (Months 1-4) will focus on design and fabrication, including detailed calculations, CAD modeling, and prototype construction.
  • Phase 2 (Months 4-6) will involve wind tunnel setup and calibration, including test section modification and comprehensive instrumentation calibration.
  • Phase 3 (Months 6-10) will cover the main testing program, with systematic wind speed variation tests and detailed performance measurements.
  • Phase 4 (Months 10-12) will be dedicated to analysis and reporting, including data interpretation and development of recommendations for full-scale deployment.
附加方案資料 Bladeless Wind Turbine Development.pdf
方案提供者資料
方案提供者:Department of Mechanical and Aerospace Engineering, HKUST
地址:HKUST, Clear Water Bay
聯絡人:李建邦
職位:Associate Head and Associate Professor
電話:3469 2232
電子郵件: larryli@ust.hk
網頁: https://mae.hkust.edu.hk/en/people/faculty/detail/li-larry

有關上述創新科技解決方案的詳情,請聯絡方案提供者查詢。