Trial Project |
First MiMEP Project of EMSD Chiller Replacement at Tai Lung Veterinary Laboratory
(REF: P-0172) |
Matched I&T Solution |
|
Solution Feature |
- MiMEP-Largely Reduced Construction Period
- Largely Reduced Client Operation Disruption
- Reduced Materials and Construction Wastage
- Increased Productivity
- Enhanced Quality Control
- Enhanced Construction Safety
- Enhanced Site Management
|
Trial Information |
Trial Site |
: |
Tai Lung Veterinary Laboratory |
Trial Scale |
: |
3 nos of chillers and 4 nos of pumps |
Trial Duration |
: |
Feb 2023 to Apr 2023 |
|
Final Report |
EMSD-M&V-P0172_Final.pdf
|