Skip to main content

section banner

Project Matching

Development of Variable Speed Control System in Filtration Plant

Trial Project Development of Variable Speed Control System in Filtration Plant
(REF: P-0169)
Matched I&T Wish Development of Variable Speed Control System in Filtration Plant
(REF: W-0327)
Matched I&T Solution Filtration plant’s variable speed control system by water quality and occupancy of the swimming pool
(REF: S-0842)
Solution Feature
  • The developed system is equipped with an intelligent control logic to control the turnover rate of the filtration plant of the public swimming pool by water quality and occupancy.
  • The proposed system is able to conduct effective people courting by IoT technology. (e.g. Radar sensor through LoRaWAN connection)
  • The proposed system is able to collect and evaluate the water quality of the swimming pool data from existing sensors (turbidity, pH, temperature, oxidation-reduction potential, water conductivity and etc)
Trial Information
Trial Site : Kwai Shing Swimming Pool
Trial Scale : 1 no. of system
Trial Duration : Dec 2020 to Jun 2022
Interim Report EMSD-M&V-P0169-W0327-S0842_Interim.pdf
Info on I&T Solution Provider
Solution Provider:ATAL Engineering Limited
Address:13/F, Island Place Tower, 510 king's Road, North Point
Contact Person:Iris Liu
Position:Sales Engineer
Tel:6071 0957
Email: irisliu@atal.com
TOP